The Rear of the Station is on the Track side. The front won't be modeled. Still to be added is the windows on the 2nd and 3rd floors. They are built and painted but waiting for "glass" and some need window air conditioners. Currently I am working on additional details on the top of the 3rd floor and the roof. |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.