Basic Method 1 Setup |
Here are three machines set together. The one on the left is using the sheath and rod. |
Here you can see the push rod and clevis attached to the crank. |
Two machines mounted vertically controlling a crossover. |
A bell crank used to change direction of the push rods |
Notice the one that used the bell crank is on its side. The push rod extends through a hole in a girder. |
Close up of the push rod thought the girder |
The final result the 1/8" tube sticking up and a piece of .039" Piano wire operating the turnout. |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.