This morning I finished wiring the third CTC panel. I need to make up and install the patch cables and test everything. That leaves the fourth panel that will be completed once the upper "town or mine" scene is designed and built. For now the CTC can control about 85% of the railroad.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.