Thursday, April 28, 2016

Penn Station. Work continues on my O Scale 80% model of the station.

The Rear of the Station is on the Track side.  The front won't be modeled.  Still to be added is the windows on the 2nd and 3rd floors.  They are built and painted but waiting for "glass" and some need window air conditioners.  Currently I am working on additional details on the top of the 3rd floor and the roof.
A close up of the middle/main section of the station.  The three arched opening lead to the main waiting room inside the building from the concourse.  I have cast the windows for the concourse but have not build the actual structure.  The platforms and train shed have to be built before the concourse can be added.

The end of the building.  Both ends are almost alike.