Thursday, September 11, 2014

Temporary Signal Bridge on the PRR mainline

Here is the new signal bridge installed and operational under CTC control.  These use the single and double heads build by Bill and Gail Carr and myself installed on a simple structural bridge made from some Plastruct shapes I had.  This will be replaced in the future by a detailed PRR signal bridge/catenary support with proper position light heads.  For now this allows us to test the CTC and ABS function and operate.

Green over Red North Bound at Bay View Yards On PRR South Bound Track

Looking South/West at Bay View Yards

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.