Here is the new
signal bridge installed and operational under CTC control. These use the single and double heads build
by Bill and Gail Carr and myself installed on a simple structural bridge made
from some Plastruct shapes I had. This
will be replaced in the future by a detailed PRR signal bridge/catenary support
with proper position light heads. For
now this allows us to test the CTC and ABS function and operate.
 |
Green over Red North Bound at Bay View Yards On PRR South Bound Track |
 |
Looking South/West at Bay View Yards |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.