Yesterday I finished the two plate girder bridges, except for walkways and fire barrels, across the Elk River. The main line to C & C Junction is in front and the branch to Durbin is in the back. The bridges are basically two blocks of wood with styrene structural shapes applies. Rail is hand laid on standard ties turned on their ends to give them more height typical of bridge ties.
|
Crossing Elk River |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.