Friday, August 15, 2014
Last Two Local Control Panels
Today I finished and installed the last two Local Control panels. There will be two additional panels needed when the Harbor Area in completed and the Port Covington is completed. They will just be turnout control panels, not local control, because they are in dark territory beyond CTC. The trestle will be installed tomorrow and then the remaining bends will be built and added. In the meantime, the railroad will be operational again after about a year or more of no operation. Once operation is restored it will be time to finish the signaling and be available to test the signal system.