Here is a snapshot of the deck of the wood trestle I am building for Blackwater grade. It is almost a scale 160' long and 80' high. The deck will be painted later and NBW castings will be added. Built with strip both commerial and some homemade stringers. The rail is code 125 and I am using Right O' Way's rail joiners which have the bolt detail cast into them. Snapshot taken with Kodak Easyshare C180. Better photos later.
Monday, December 24, 2012
Wednesday, September 12, 2012
Second Part of CTC is nearing completion
| Front of Lower Panel |
| Half of the CTC showing Model Boards and Lower Panels |
Monday, May 28, 2012
Tuesday, May 22, 2012
Update May 22, 2012 Painting Finished
My Son in law and his brother have finished drywalling, priming, and painting the ceiling and the backdrop for the layout. Below are a selection of photos of the results. Now we have to clean off the top of the layout and get back to building the WV&TRR.
Wednesday, May 9, 2012
Layout Update May 9, 2012
It has been a while since I posted to the blog. Currently we are in the process of dry walling the ceiling of the layout room. We have used 50 sheets of drywall. Today by Son In Law tapes about 40% of the ceiling. After taping all of the ceiling there are two additional coats of drywall compound, then primer, and finally paintint the entire ceiling. Then we can get back to building the railroad.
Wednesday, March 28, 2012
Progress Report 03/28/12
We have continued to install the drywall ceiling. So far we have hung 24 of the expected 60 sheets of drywall over the existing railroad. No one should ever build a layout without finishing the ceiling first. It is a real pain to hang drywall over a layout. However the improvement in the looks of the layout will be worth the pain and problems incurred now. I am also installing Can type recessed lighting to illuminate the aisles. The layout during construction and during operation will have it own lighting system consisting of 100+ CFL 13 watt lights, some spots in areas of special interest and blue rope lights to allow for night operations. We also have red ropes at the horizon to create a sunrise and sunset look. When LED lights become more affordable, the CFLs will be replaced as they burnout with LEDs. When we then reach the point that the entire layout is lit by LED and rope lights, I will add dimmers and some type of automatic day to night sequencer.
Hopefully the drywall work will be done in a couple of months and we can then return to scenery, the CTC system, structures and rolling stock.
Hopefully the drywall work will be done in a couple of months and we can then return to scenery, the CTC system, structures and rolling stock.
Saturday, February 25, 2012
Progress Report 02/25/12
Hung more smaller pieces of drywall and installed some of the plastice channel to support the fiberglass tiles along the wiring channel or race. I believe this is easier than putting up masonite sheets and screws. For now I have left the light cans un-covered to the wiring is done. Leaving the 16 inch space occupied by the lights open, allows you to shift the fiberglass tiles back and forth to get access to the plugs for lighting.
Also installed some of the rope light hooks for the blue rope lights. These are attached on the wood strip that secures the valance. Also intend to start cleaning up all the trash from removing the old light and valance wood frames and roll up the unused rope lights and clips. Then if time is left will continue to remove the old stuff from the ceiling, moving wires, and getting ready for more drywall which I will get Tuesday morning.
Also installed some of the rope light hooks for the blue rope lights. These are attached on the wood strip that secures the valance. Also intend to start cleaning up all the trash from removing the old light and valance wood frames and roll up the unused rope lights and clips. Then if time is left will continue to remove the old stuff from the ceiling, moving wires, and getting ready for more drywall which I will get Tuesday morning.
Subscribe to:
Posts (Atom)





